Wednesday, August 29, 2012

Checklist time ....

 so ..... let's run through the check list.

as previously reported .... the caravan is on site.  check

 first (of many!) water tanks in ......

check!!!!!

water tank filled ...
checked!!!!!


power pole delivered .....

 check!!!!!

power brought on to site  ....
check!!!!!
(yes, need a post on why we are on grid vs solar right from the start)

kids being ever so cute and very, very helpful

i reckon there is a six-pack developing on that boy!


ok mum .... time for a break!  let's get muddy!

so some big ticks in the done box this week ......

next .....

  • getting the amenities shed up
  • fitting out the amenities shed so we have a working loo and shower!
  • getting the caravan up on bricks and stabalized ....then we can put the annex up and start moving our stuff in
i reckon we are still about 3 weeks away from moving.  as long as it is september i am ok with that.  that will leave plenty of time for spring planting .... i have heaps of things to plant .... tomato's / leeks / artichokes / beans / greens / onions are all ready to be planted out .... so biding my time .... but barely!  i'm really ready to start rockin' in the veg patch BIG TIME!

1 comment:

  1. That will be perfect weather for moving to the block, not too hot and not too cold. The kids look like they are having a ball. When we were in the middle of building and living in the garage, one of the things I found I couldn't live without was my slow cooker as it didn't make too much mess.
    It looks like it is all happening at 'Just Earth'.

    ReplyDelete